Future Plans
• The proposed extension covers around 91 hectares of land to the south of the current site.
• It would be worked in five phases, with each area restored once extraction is finished so that only a limited part of the land is in use at any one time.
• The restoration plans include new waterbodies, reedbeds, grassland, woodland and areas of agricultural land, helping to increase biodiversity and create a landscape that can be enjoyed long after quarrying has ended.
• The existing plant site and access road would be retained, meaning no new entrance is required and HGV movement restrictions would remain in place.
• Sand and gravel would be moved by an extended conveyor system across the site to the plant.
Alongside the main planning application, three linked Section 73 applications will be submitted to update existing restoration plans at the quarry and to integrate the current site with the proposed extension.
To read more information about the proposed extension and associated Section 73 applications, please take a read of our consultation boards here. You can watch our webinar here.
